Content Review & Revision Control
Collaborate with Instructional Designers to keep maintenance procedures current, accurate, and aligned with the latest service bulletins.
Procedure Sections
Inspect all 22 fan blades for nicks, dents, and leading-edge erosion. Allowable nick depth: 0.020 in max within blend limits. Cracks: none permitted.
Rotate spinner through 360°. Inspect for surface cracks radiating from fastener holes. Torque check on all 6 attachment bolts to 45 in-lb.
Verify all cowling latches are engaged and safety-wired per figure 4. Confirm no chafing on hinge assemblies.
Engine Diagram Markup

Flag Outdated Content
Suggest Procedure Update
Submit a revision note. It will enter the ID review queue as a new pending version.
Revision History
- v2.1· Nov 12, 2026ApprovedK. Reyes, A&P/IALead SME · Powerplant
Updated nick blend limits per SB 72-0384. Added torque values to spinner procedure.
- v2.0· Aug 03, 2026ApprovedM. Osei, DERSME · Structures
Reworked cowling latch verification steps. Added figure references.
- v1.9· Apr 21, 2026SupersededJ. Whitfield, A&PInstructional Designer
Initial competency-based rewrite from legacy CBT module.